Redmond and the Eastside, WA
Swap your tub for a walk-in showerYour tub out. A tiled walk-in shower in.
We come to your home, measure the bathroom and talk through the plan. You leave with a clear next step, and a written, itemized estimate before any demo starts.
Free in-home measure, then your new walk-in shower installed in about 5 to 8 working days.
Book my free visit
How it works
- 1
Book your free visit ๐
Pick a time that works for you. It takes about a minute.
- 2
We measure and plan.
We come to your home, measure the space, and talk through tile, glass and fixtures.
- 3
Written estimate, then install.
You get a written, itemized estimate before demo starts. Once you say go, the shower is built in about 5 to 8 working days.
Thanks for checking. We don't serve that ZIP yet.
Leave your first name and phone and we will keep you posted.
Thanks. We will keep you posted.
What would you like to do?
What's in the room now?
When would you like to start?
Do you own the home?
This visit is set up for the person who owns the home. If you are helping them, share this page so they can book.
Or leave your first name and phone and we will pass it on.
Thanks. We will be in touch.
Recent showers by AIM Builders








Why AIM Builders
- Licensed, bonded and insured in Washington
- Free in-home visit
- Written, itemized estimate before demo starts
- Custom tile walk-in showers, built on site
Questions people ask
How long does it take?
Most tub-to-shower swaps take about 5 to 8 working days on site once materials are in. Glass is fitted after the tile is done. We confirm your timeline at the visit.
What happens at the visit?
We come to your home, measure, look at the plumbing and the floor, and talk through your plans and finishes.
What does it cost?
It depends on the size of the room, the tile and the glass. You get a written, itemized estimate before any demo starts, so you know the full cost first.
Is the visit free?
Yes. The measure and the written estimate are free.
